Sierra Linda Mutual Water Company Consolidation, Metering, and Water Treatment Project
3 Documents in Project
Summary
SCH Number
2017031075
Lead Agency
State Water Resources Control Board
Document Title
Sierra Linda Mutual Water Company Consolidation, Metering, and Water Treatment Project
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2017
Present Land Use
Zone district: rural mtn. single family, res. rural single farm. 3 acs. GP: rural res, very low density res
Document Description
The Sierra Linda Mutual Water Company Consolidation, Metering, and Water Treatment Project includes the consolidation of the Bass Lake Annex #3 into the SLMWC water system and construction of water treatment and distribution facilities to meet arsenic and uranium max contaminant load standards and improve the quality of water supplied to the SLMWC's service area and the Bass Lake Annex #3 area. Specific project facilities would include water meters, a developed test well, five new storage tanks, new distribution pipelines, booster and fire pumps, and a new treatment facility.
SWRCB is serving as lead agency for California Environmental Quality Act (CEQA) as the project applicant is a non-governmental agency (CEQA Guidelines 15051). Additionally, the State Water Board may provide funding for the project through the Safe drinking Water State Revolving Fund Program (Public Resources Code 21102.
Contact Information
Name
Carol E. Atkins
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Madera
Cross Streets
Rd 222/Highland Dr
Zip
93669
Total Acres
3
Parcel #
061-371-015, -013, etc
Waterways
Near Number Three Ditch, N. Fork Willow Cr., Bass Lake
Township
8S
Range
22E
Section
2, 11
Base
MD
Other Location Info
Bass Lake Annex
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.