Castilleja School Project

2 Documents in Project

Summary

SCH Number
2017012052
Lead Agency
Palo Alto, City of (City of Palo Alto)
Document Title
Castilleja School Project
Document Type
EIR - Draft EIR
Received
Project Applicant
Castilleja School Foundation
Present Land Use
Comprehensive Plan - single family residential; zoning - R-1(10,000)

Document Description
Note: Review Per Lead Castilleja School Foundation requests amendment of their existing Conditional Use Permit, a Tentative Map with exceptions to consolidate the three parcels on which the campus is located into a single parcel that exceeds the maximum parcel size in the R-1 zone district, and Architectural Review. Construction of proposed physical improvements would occur in four phases. These include demolishing two residential structures, constructing a below-grade parking structure, constructing a temporary campus, relocating the existing pool, relocating service deliveries a below grade service area, and demolishing the existing Campus Center and classroom buildings and replacing them with a single Academic building. The project also includes implementation of an expanded Transportation Demand Management plan and a Sustainability Road Map.

Contact Information
Amy French
City of Palo Alto
250 Hamilton Avenue, 5th Floor, PCE
Palo Alto, CA 94301

Phone : (650) 329-2336

Location

Cities
Palo Alto
Counties
Santa Clara
Cross Streets
1310 Bryant Street and 1235 and 1263 Emerson Street
Zip
94301
Total Acres
6.6
Parcel #
124-12-034, -031 , and-033
State Highways
82, US 101
Railways
Caltrain
Schools
Palo Alto HS
Waterways
San Francisquito Creek

Notice of Completion

Review Period Start
Review Period End
Development Type
Educational (Modernize existing private school)
Local Action
Master Plan Site Plan Other Action
Project Issues
Aesthetic/Visual Air Quality Archaeologic-Historic Geologic/Seismic Noise Schools/Universities Traffic/Circulation Growth Inducing Land Use Cumulative Effects
Reviewing Agencies
Air Resources Board, Transportation Projects California Department of Education California Department of Parks and Recreation California Highway Patrol California Public Utilities Commission Caltrans, District 4 Department of Fish and Wildlife, Region 3 Department of General Services Department of Toxic Substances Control Department of Water Resources Native American Heritage Commission Office of Historic Preservation Regional Water Quality Control Board, Region 2 Resources Agency State Water Resources Control Board, Division of Drinking Water

Attachments

Environmental Document
00_NOP Cover   PDF 41 K 01_Castilleja NOP Jan 2017 revised   PDF 504 K 02_Castilleja Initial Study 012317   PDF 2554 K 03_index of NOP comments   PDF 77 K 04_Comment Letters_Combined   PDF 43961 K arborist assessment   PDF 664 K B1 Castilleja Campus Master Plan planset March 2018   PDF 20483 K B2 Architectural Review Plans July 2019   PDF 104261 K B3a Proposed Expanded TDM Plan June 2016   PDF 584 K B3b Current TDM Plan 2013   PDF 401 K B3c TDM Plan Supplement Memo 2019   PDF 393 K B4 Sustainability Road Map   PDF 819 K B5 Special Events Calendar March 2018   PDF 63 K Castilleja Geotech Peer Review   PDF 217 K Castilleja Geotech SVSE   PDF 10148 K Castilleja School Cultural Report_Final_07092019_NO APPX A   PDF 5232 K Castilleja School Noise Analysis Salter 2018   PDF 438 K Castilleja School Project Draft EIR   PDF 54881 K Castilleja_School_Phase-1_Annual   XLS 298 K Castilleja_School_Phase-1_Input   XLS 86 K Castilleja_School_Phase-1_Summer   XLS 262 K Castilleja_School_Phase-1_Winter   XLS 262 K Castilleja_School_Phase-2_Annual   XLS 200 K Castilleja_School_Phase-2_Input   XLS 82 K Castilleja_School_Phase-2_Summer   XLS 169 K Castilleja_School_Phase-2_Winter   XLS 169 K Castilleja_School_Phase-3_Annual   XLS 259 K Castilleja_School_Phase-3_Input   XLS 85 K Castilleja_School_Phase-3_Summer   XLS 224 K Castilleja_School_Phase-3_Winter   XLS 224 K Castilleja_School_Phase-4_Annual   XLS 354 K Castilleja_School_Phase-4_Input   XLS 89 K Castilleja_School_Phase-4_Summer   XLS 311 K Castilleja_School_Phase-4_Winter   XLS 311 K Daily Average Criteria Pollutant Emissions   XLSX 13 K GHG inventory   PDF 500 K Noise Analysis Peer Review 060817   PDF 599 K OperationalVehicleEmissions   PDF 558 K Original Tree Locations Phase 1 and Phase 2 Tree locations submitted January 8, 2018   PDF 324 K Summary Form   PDF 641 K Traffic Impact Study for the Castilleja School Expansion   PDF 34249 K Tree canopy replacement letter submitted January 8, 2018   PDF 52 K Tree List Submitted January 8, 2018 5 pages   PDF 391 K Tree Relocation and Maintenance Plan (TRMP) January 8, 2018 submittal   PDF 233 K
NOC
NOC   PDF 1689 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print