Hot Water Sprocket District Distribution and Building Conversion
39 Documents in Project
Summary
SCH Number
2017012008
Lead Agency
University of California, Davis
Document Title
Hot Water Sprocket District Distribution and Building Conversion
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2024
Document Description
The UC Davis Hot Water Phase 2 Conversion Project will replace the old and inefficient campus steam distribution system with a new energy-efficient hot water system for heating. The Project has two components: (1) installing underground hot water pipelines; and (2) mechanical upgrades within buildings to support the conversion to hot water heating. The Project would install approximately 5 miles of underground hot water pipes along 2.5 miles of trench to provide hot water heating system for 36 buildings with an approximate total square footage of 1.6 million square feet of building space. The conversion requires equipment modifications within existing building mechanical rooms. The Project would expand and connect to the hot water distribution lines installed in the previously approved and completed Hot Water Quad Loop and Hutchison Conversion Project.
Contact Information
Name
Heather Davis
Agency Name
UC Davis
Job Title
Director of Campus Planning and Environmental Stewardship
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Email
Location
Cities
Davis
Counties
Yolo
Regions
Northern California
Cross Streets
Bioletti Way and California Ave
Other Location Info
Various locations within UC Davis core campus
Notice of Determination
Approving Agency
UC Davis
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to an EIR)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.