Orchard Park Connectivity Improvements Project

32 Documents in Project

Summary

SCH Number
2017012008
Lead Agency
University of California, Davis
Document Title
Orchard Park Connectivity Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
1/28/2021
Present Land Use
Student Housing
Document Description
The Orchard Park Connectivity Improvements project proposes transportation, electrical, and other associated off-site utility improvements to support the Orchard Park Graduate Student Housing and Family Housing Redevelopment project. Connectivity Improvements include a new sidewalk along the north side of Blue Ridge Road (formally called Orchard Road), improved bicycle lanes, curb ramp and striping improvements, water main line replacement, and roadway rehabilitation between Orchard Park Circle and La Rue Road. On Orchard Park Drive from Blue Ridge Road to Extension Center Drive and Extension Center Drive to Hutchison drive, connectivity improvements proposed would upgrade transportation facilities to a Class III bikeway, lighting, and close pedestrian network gaps with additional sidewalks. A shared use path will be constructed to connect to existing facilities along Hutchison Drive to Health Science Drive. Offsite electrical connectivity improvements include replacing existing cables and utilizing existing duct banks from Hutchison Drive to La Rue Road. In addition, cables will be replaced as needed within existing duct bank along Orchard Park Drive.

Contact Information

Name
Matt Dulcich
Agency Name
University of California, Davis
Contact Types
Lead/Public Agency

Name
Agency Name
University of California
Contact Types
Project Applicant

Location

Counties
Yolo
Zip
95616

Notice of Determination

Approving Agency
UC Regents
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to approved 2018 LRDP EIR)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print