Orchard Road Sewer Main Project
39 Documents in Project
Summary
SCH Number
2017012008
Lead Agency
University of California, Davis
Document Title
Orchard Road Sewer Main Project
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2020
Present Land Use
Roadway
Document Description
Notice of Determination for Orchard Road Sewer Main Project a project element of the UC Davis 2018 Long Range Development Plan (LRDP) EIR, including Volume 3 Orchard Park Housing Redevelopment Component. The Orchard Road Sewer Main Project will implement Orchard Park Redevelopment (OPR) Project Mitigation Measures 3.17-1. With the proposed sewer line (12” diameter) replacing the existing sewer line (8” diameter) that would be provided by OPR Mitigation Measure 3.17-1, adequate capacity would be available within the wastewater collection system serving the Orchard Park site to accommodate increased flows associated with the additional student housing.. The project implements Orchard Park Student Housing Mitigation Measure 3.17-1: Upsize Sewer Line within Orchard Road. The length of replacement is approximately 1,200 linear feet. Construction involves saw cutting approximately 2,600 linear feet of asphalt roadway, excavation/backfill, sheeting and shoring to place the new pipe, trenching for new pipe placement, lateral/sewer main reconnections, repaving to replace the asphalt roadway. The old 8-inch sewer line will be abandoned in-place. The west end will be stubbed at the Orchard redevelopment site while the east end will be connected to 12-inch diameter line in the east side of La Rue Road.
Contact Information
Name
Matt Dulcich
Agency Name
University of California Davis
Contact Types
Lead/Public Agency
Phone
Location
Counties
Yolo
Regions
Northern California
Cross Streets
Orchard Road and La Rue Road
Zip
95616
Other Location Info
University of California Davis
Notice of Determination
Approving Agency
University of California Davis
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.