Harbor Substation

2 Documents in Project

Summary

SCH Number
2016121055
Lead Agency
City of Anaheim
Document Title
Harbor Substation
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2017
Present Land Use
Public institutional , land use=utility, public
Document Description
The Harbor Substation will consist of two 45 megavolt-amp (MVA) transformers and switchgear distribution system. The two new signal-story structures will be constructed; a structure measuring approx. 180 feet by 50 feet, and a second structure measuring approx. 90 feet by 50 feet. The latter surface will house two transformers. Underground 69 kV and 12 kV transmission and distribution lines will be installed in the rights of way at Cerritos Ave., Katella Ave., Hast St., Zeyn Street., Disney Way, Harbor Blvd., Clementine Street., Anaheim Blvd., Manchester Ave and Ninth St. Subterranean vaults (approx. 8 feet by 20 feet) will be installed at depths of approx. 9 feet below grade on Katella Ave., Zeyn ST., Anaheim Blvd, Haster street, Disney Way, Clementine Street, and Manchester Ave. The new lines will also allow the electrical load to be distributed between a greater number of circuits in the central Anaheim Area, providing improved flexibility for serving electric loan to be distributed between a greater number of circuits in the Central Anaheim Area, providing improved flexibility for serving electric loads during outages or maintenance activities.

Contact Information

Name
Larry Davis
Agency Name
12 Civic Plaza, ROom 106
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Cross Streets
Katella, Zeyn, Cerritos, Haster, Disney, Harbor, Clementine, Anaheim, Manchester, Ninth
Zip
92802
Total Acres
0.87
Parcel #
varies
State Highways
I-5, SR 57
Railways
LOSSAN
Waterways
Santa Ana River

Notice of Determination

Approving Agency
City Council, Orange
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print