Fenton Water Diversion Removal and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2018-0638-R1)
5 Documents in Project
Summary
SCH Number
2016112018
Lead Agency
Mendocino County
Document Title
Fenton Water Diversion Removal and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2018-0638-R1)
Document Type
NOD - Notice of Determination
Received
Posted
5/10/2019
Document Description
The project consists of two encroachment(s): One encroachment is for the removal of an unpermitted water diversion infrastructure from an unnamed tributary to Feliz Creek. Water was diverted to fill a nearby off-stream reservoir. Work for removal of the water diversion infrastructure will include excavation of rock and sediment away from a 12" PVC pipe to allow access to the pipe, removal of the diversion by cutting the 12" PVC pipe flush with the stream bank and placing a PVC cap on the end to prevent water from entering the pipe. Any rock and sediment moved aside during deconstruction activities will be replaced and recontoured to mimic natural stream channel morphology. The other proposed encroachment is to upgrade a failing and undersized culvert. Work for this encroachment will include excavation, removal of the failing culvert, replacement with a new properly sized culvert. backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
See NOD for full details.
Contact Information
Name
John Herrera
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Department of Fish and Wildlife
Contact Types
Project Applicant
Location
Counties
Mendocino
Township
13N
Range
12W
Section
10
Base
MDB&M
Other Location Info
The project is located approximately 3.3 miles northwest of the town of Hopland; affecting one unnamed tributary to Russian River in the County of Mendocino, State of California. Yorkville, Calif. 7.5-minute quadrangle, U.S. Geological Survey (USGS) map.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.