Horseshoe Bend Levee Improvement Project
5 Documents in Project
Summary
SCH Number
2016112018
Lead Agency
Bethel Island Municipal Improvement District
(BIMID)
Document Title
Horseshoe Bend Levee Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/24/2017
Present Land Use
Levee site/contra costa county F:1 Recreational district/ contra costa county: AL, SH, CR, PR, OS
Document Description
BIMID proposes to conduct four activities on Bethel Island: excavate fill material from a previously authorized borrow site located on the Crivello property (Borrow Site) (APN 028-010-004), conduct levee improvements and habitat enhancement activities at the Horseshoe Bend Levee Improvement project, create wetlands and adjacent riparian habitat at the District's existing mitigation site, and use connected roadways (Haul Roads) for hauling materials between the Borrow Site, Levee Site, and Mitigation Site.
Contact Information
Name
L. Jeff Butzlaff
Agency Name
Bethel Island Municipal Improvement District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Oakley
Counties
Contra Costa
Cross Streets
Bethel Island Rd
Zip
94511
Total Acres
105
Parcel #
multiple
Waterways
Taylor Slough, Piper Slough
Base
MD
Other Location Info
Bethel Island
Notice of Determination
Approving Agency
Bethel Island Municipal Improvement District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.