Horseshoe Bend Levee Improvement Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016112018
- Lead Agency
- Bethel Island Municipal Improvement District (BIMID)
- Document Title
- Horseshoe Bend Levee Improvement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/24/2017
- Present Land Use
- Levee site/contra costa county F:1 Recreational district/ contra costa county: AL, SH, CR, PR, OS
- Document Description
- BIMID proposes to conduct four activities on Bethel Island: excavate fill material from a previously authorized borrow site located on the Crivello property (Borrow Site) (APN 028-010-004), conduct levee improvements and habitat enhancement activities at the Horseshoe Bend Levee Improvement project, create wetlands and adjacent riparian habitat at the District's existing mitigation site, and use connected roadways (Haul Roads) for hauling materials between the Borrow Site, Levee Site, and Mitigation Site.
- Contact Information
-
L. Jeff Butzlaff
Bethel Island Municipal Improvement District
Lead/Public Agency
9085 Stone Road PO Box 244
Bethel Island, CA 94511
Phone : (925) 684-2210
Location
- Coordinates
- 38°02'32"N 121°38'53"W
- Cities
- Oakley
- Counties
- Contra Costa
- Cross Streets
- Bethel Island Rd
- Zip
- 94511
- Total Acres
- 105
- Parcel #
- multiple
- Waterways
- Taylor Slough, Piper Slough
- Base
- MD
- Other Location Info
- Bethel Island
Notice of Determination
- Approving Agency
- Bethel Island Municipal Improvement District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 3085 Stone Road, Bethel Island, CA 94511
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.