Aliso Creek - Limkiln Creek Restoration Project (W.O. EW40062A)

2 Documents in Project

Summary

SCH Number
2016101027
Lead Agency
City of Los Angeles
Document Title
Aliso Creek - Limkiln Creek Restoration Project (W.O. EW40062A)
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2017
Present Land Use
Open space/OS
Document Description
The proposed project will include the design and construction of stormwater BMPs to treat urban runoff and stormwater to reduce pollutants in flow from Aliso and Limkiln Creeks, which ultimately flows to the LA River. Proposed BMPs include in channel diversions, pump stations, pretreatment devices, subsurface piping, vegetated biofiltration basins and electrical and instrumentation equipment. Urban runoff and stormwater from Aliso Creek, Limkiln Creek flood control channels, and an existing 102-inch storm drain pipe willbe diverted to pretreatment devices for removal of trash and debris. The partially treated water will then be conveyed to three biofiltration basins located on the southeast, south, and west portions of the project area. The treated water and overflow is eventually redirected back to the creeks that ultimately drain into the LA River. The basins would be designed to preserve the natural look of the park and may function as wildlife habitat. Other BMPs may include permeable paving and interpretive signage.

Contact Information

Name
Shokoufe Marashi
Agency Name
City of Los Angeles
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
8956 Vanalden Ave.
Zip
91324
Total Acres
7.6
Parcel #
2784001901
Railways
UPRR
Schools
Calahan ES
Waterways
Aliso Creek, Limeklin Creek, Wilber Wash
Township
2N
Range
16W
Other Location Info
Northridge

Notice of Determination

Approving Agency
City of LA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print