Morro Bay Water Reclamation Facility

7 Documents in Project

Summary

SCH Number
2016081027
Lead Agency
City of Morro Bay
Document Title
Morro Bay Water Reclamation Facility
Document Type
NOD - Notice of Determination
Received
Posted
6/9/2021
Document Description
The Project includes new wastewater treatment facilities at the WRF site that would allow the City to upgrade to full secondary treatment, and development of an advanced water treatment facility The Project also includes a finished water storage tank and pump station (located at the WRF site), injection wells, and monitoring wells. Advanced treated recycled water produced at the WRF would be used for indirect potable reuse via groundwater injection. An approximately 3.6-mile recycled water distribution system will be built to convey water to one of two injection well areas, and waste discharge pipeline to convey brine or treated wet weather flows to the ocean outfall.

Contact Information

Name
Cedric Irving
Agency Name
State Water Resources Control Board
Contact Types
Responsible Agency

Location

Cities
Morro Bay
Counties
San Luis Obispo
Regions
Citywide, Unincorporated
Other Information
The project is located in unincorporated areas around and within the City of Morro Bay (City) in San Luis Obispo County (County), California, at the crossroads of Highway 1 and Highway 41. The proposed Water Reclamation Facility (WRF) site is located in an unincorporated portion of the County adjacent to the City, while the remaining infrastructure is located in the City itself. The WRF would be constructed on an approximately 10- to 15-acre area within a 396-acre parcel that is located along Highway 1, north of the northern terminus of South Bay Boulevard.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
595 Harbor St, Morro Bay, CA 93442

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print