Tustin Downtown Commercial Core Specific Plan (DCCSP)

3 Documents in Project

Summary

SCH Number
2016081004
Lead Agency
Tustin, City of (City of Tustin)
Document Title
Tustin Downtown Commercial Core Specific Plan (DCCSP)
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2018
Present Land Use
Z: C1, C2, CG, MGP, PC COM, PC-RES, P&I, PR, PM, SP10; LU: CC, I, MHP, OTC, PI PCCB, PO

Document Description
The proposed SP establishes the long-term vision with goals and objectives to create a vibrant, cohesive, connected, livable, and memorable city core. The SP is divided into six development areas, establishes permitted uses, development standards, and design criteria regulating/guiding site planning, building design, parking, architectural treatment and circulation improvements. The SP would provide for infill development of approx. 300,000 sf of non-residential and for a residential city-maintained housing bank with a max of 887 new dwelling units that could be requested by potential developers. The project includes a GPA, ZCA, ZC, map revisions, and recision of 5 planned communities and the First Street SP.

Contact Information
Dana L. Ogden
City of Tustin
300 Centennial Way
Tustin, CA 92680

Phone : (714) 573-3109

Location

Coordinates
33°7.43'1.94"N 117°8.22'4.15"W
Cities
Tustin
Counties
Orange
Cross Streets
Main St and Prospect Ave
Zip
92780
Total Acres
220
Parcel #
multiple
State Highways
I 5, Hwy 55
Schools
4
Township
5W
Range
9W
Section
16
Base
SBM

Notice of Determination

Approving Agency
City of Tustin
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
300 Centennial Way, Tustin, CA 92780

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search