Lincoln Landing Project (Application No. 201401148)

3 Documents in Project

Summary

SCH Number
2016072018
Lead Agency
City of Hayward
Document Title
Lincoln Landing Project (Application No. 201401148)
Document Type
NOD - Notice of Determination
Received
Posted
5/1/2017
Present Land Use
Use: vacant buildings; Z: CC-C; GPD: City center retail and office commercial
Document Description
The project includes development of a six-story mixed-use development with 80,500 sq. ft. of commercial uses and 476 apartment units, with a combination of surface and structured parking. Structures include two separate residential towers on the northern and southern portions of the site joined by a central smaller scale commercial structure with no residential development above. The existing office building and commercial building on the site would be demolished to accommodate the project, and the existing parking structure would be retained. The site would be subdivided into four parcels for the development of the mixed-use building, a park, and site and utility improvement. A two-way, right-in/right-out driveway divided by a planting strip would provide access for vehicular traffic traveling northbound on Foothill Blvd. Northbound and Southbound traffic would access the site from two driveway entrances on City Center Drive and two driveway entrances on Hazel Drive. A rear alleyway would run along the western property line from City Center Drive to Hazel Avenue to provide emergency access, commercial vehicle access, and resident access to the existing and proposed residential tower parking garages. The project includes a small pocket park at the northwestern corner of the site that would connect to a proposed creek walk along the existing maintenance path, owned by the Alameda County Flood Control and Water Conservation District. The proposed creek walk would upgrade the existing 15-foot wide maintenance road that runs along San Lorenzo Creek at the western boundary of the site in order to make it a publicly-accessible multi-use bicycle and pedestrian path. Improvements related to the creek walk include resurfacing of the existing maintenance roadway, installation of a safety rail and installation of electricity and lights. In addition, a portion of the existing approx. 12-foot-tall privately owned retaining wall would be removed and replaced with a series of shorter terraced, landscaped retaining walls to enhance visibility of the path and to provide light and access to the pathway.

Contact Information

Name
Leigha Schmidt
Agency Name
City of Hayward
Contact Types
Lead/Public Agency

Location

Cities
Hayward
Counties
Alameda
Cross Streets
Foothill Blvd/Hazel Ave
Zip
94541
Total Acres
11.3
Parcel #
428-0026-068-01, -067-03
State Highways
580, 238, 880
Railways
UPRR/Amtrak; BART
Schools
Multiple
Waterways
San Lorenzo Creek

Notice of Determination

Approving Agency
City of Hayward
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print