Removal Action Plan (Cleanup Plan) Offsite Properties Within The Exide Preliminary Investigation Area

5 Documents in Project

Summary

SCH Number
2016061032
Lead Agency
Department of Toxic Substances Control
Document Title
Removal Action Plan (Cleanup Plan) Offsite Properties Within The Exide Preliminary Investigation Area
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2017
Present Land Use
The Preliminary Investigation Area (PIA) is a 1.7 mile radius around the Former Exide Facility located in Vernon. The PIA includes properties within the following seven jurisdiction: Cities of Bell, Commerce, Huntington Park, Los Angeles, Maywood, and Vernon and the County of Los Angeles. The area is urbanized and developed with residential, commercial, and industrial uses.
Document Description
The project consists of approval by the DTSC of the Final Removal Action Plan (Cleanup Plan) submitted by URS on behalf DTSC on July 6, 2017. DTSC's approval action is being undertaken pursuant to the regulatory authority granted under Ch. 6.5, Division 20 of the Health and Safety Code and Under AB 118 )Santiago, Statutes of 2016) and SB 93 (De Leon, Statutes of 2016), which provided the funding for the project. The underlying purpose of the Cleanup Plan is to select a method for cleaning up sensitive land use properties within the Preliminary Investigation Area with the highest lead concentrations in the soil and greatest potential for exposure. The PIA is defined as an irregularly-shaped area encompassing an approx.. 1.7 mile radius around the former Exide Technologies, Inc. battery recycling facility (Exide Facility). The area within and surrounding the PIA is developed with residential, commercial, and industrial uses. The Cleanup Plan is focused on sensitive land use properties, rather than commercial and industrial properties. The uses of properties in the PIA are governed by the General Plans and zoning designations within each local jurisdiction. With the currently available funding, DTSC anticipates that it will be able to clean up approx. 2,500 properties within the PIA. The EIR evaluated cleaning up as many as 3,500 properties within the Pia in the first year and 10,000 properties within the PIA over four years. This more comprehensive evaluation of potential impacts will also allow the analysis in this document to support future phases of cleanup that may occur, which will allow such work to proceed more quickly. Once a property has been selected for cleanup, a property-specific Excavation, Disposal, and Restoration Design Plan will be developed for the cleanup of the property. Although the overall framework for soil excavation, removal, and restoration at properties with lead-impacted soil is established in detail in the Cleanup Plan, each property within the PIA is unique. For this reason, a property-specific Design Plan will be developed based on the results of the soil assessment and DTSC's evaluation. The property will be cleaned up in accordance with the Cleanup Plan and property-specific Design Plan. However, in general, cleanup activities would occur in three stages, pre-excavation activities, excavation and removal of soil, and property restoration.

Contact Information

Name
Hortensiz Muniz
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Bell, Commerce, Huntington Park, Huntington Park, Los Angeles, City of, Commerce, Bell, Los Angeles, Maywood, Vernon
Counties
Los Angeles
Cross Streets
Multiple
Total Acres
6,000
Parcel #
Multiple
State Highways
5, 710, 60
Railways
LA Junction Railway, BNSF
Schools
Multiple
Waterways
Los Angeles River

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print