Wastewater Treatment Plant Phase II Expansion Project

5 Documents in Project

Summary

SCH Number
2016052031
Lead Agency
City of Brentwood
Document Title
Wastewater Treatment Plant Phase II Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2023
Document Description
The City initiated planning for the ongoing Phase II WWTP expansion project in 2016 to expand the treatment capacity from 5 million gallons per day (MGD) average dry weather flow (ADWF) to 7.5 MGD ADWF. The City prepared an Initial Study to evaluate potential environmental impacts from construction and operation of the Project and adopted a Mitigated Negative Declaration (MND) on August 9, 2016. As originally proposed, the Project involved construction of a biosolids dryer building and storage silo as a means of producing Class A biosolids, thus facilitating additional uses or disposal methods for the biosolids. The City has since decided to use different technology and place the biosolids drying facilities at a different location. The project modifications consist of the following main components. 1. Installation of a biosolids drying and pyrolysis system (BDPS) outside of the existing footprint of the WWTP. 2. Realignment of a paved connector path to the Marsh Creek trail. 3. Installation of new WWTP perimeter fencing around the BDPS. 4. Tree removal. All project components would be constructed on 4 acres of City-owned property immediately adjacent to the east boundary of the current WWTP

Contact Information

Name
Casey Wichert
Agency Name
City of Brentwood
Job Title
Director of Public Works
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Brentwood
Counties
Contra Costa
Regions
Citywide
Cross Streets
Elkins Way and Sunset Road
Zip
94513
Total Acres
8
State Highways
State Route 4
Railways
UPRR
Airports
None
Waterways
Marsh Creek
Township
1N
Range
3E
Section
6

Notice of Determination

Approving Agency
City of Brentwood
Approving Agency Role
Lead Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
150 City Park Way, Brentwood CA 94513

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.