State Route 210 Mixed Flow Lane Addition Project (Streambed Alteration Agreement No. 1600-2017-0120-R6)

7 Documents in Project

Summary

SCH Number
2016051039
Lead Agency
California Department of Transportation, District 8
Document Title
State Route 210 Mixed Flow Lane Addition Project (Streambed Alteration Agreement No. 1600-2017-0120-R6)
Document Type
NOD - Notice of Determination
Received
Posted
10/3/2018
Present Land Use
Various
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0120-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, San Bernardino County Transportation Authority. The project will widen the existing segment of State Route 210 (SR-210) from Sterling Avenue to San bernardino Ave (6.1 miles between PM R26.3 and R32.4) from four mixed flow lanes to six mixed flow lanes (three lanes in each direction) with the addition of one mixed flow lane in each direction. The third lane will be added within the existing SR-210 median, resulting in six, 12-foot wide mainline lanes. The project will construct/install auxillary, acceleration, and deceleration lanes; several bridge expansions; scour, slope and pire protection features; stormwater treatment and pollution prevention features; retaining and sound walls; associated traffic management system elements (e.g., wireless vehicle detection stations, ramp metering systems, electronic message boards, and fiber optic backbone system to support these elements)

Contact Information

Name
Edith Martinez
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Highland, Redlands, San Bernardino
Counties
San Bernardino
Cross Streets
Highland Ave, Base Line, San Bernardino and 5th St/Greenspot Rd
Total Acres
249.45
Parcel #
various
State Highways
SR-210, 330 I-10
Airports
San Bernardino International
Schools
various
Waterways
Sand Creek, City Creek, Plunge Creek, Santa Ana River
Other Information
Post mile marker R25.0 and R33.2

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print