Former Southwest Marine Property Remedial Action Plan

2 Documents in Project

Summary

SCH Number
2016041059
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Former Southwest Marine Property Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2016
Present Land Use
Industrial
Document Description
DTSC is considering approval of a Revised Soil and Groundwater Remedial Action Plan for the former Southwest Marine property (site) pursuant to Chp 6.8 of the California Health and Safety Code. The RAP, prepared by the Source Group Inc. and dated Feb 2015, proposes excavation with off-site soil disposal/recycling and long term monitoring of groundwater with monitored natural attenuation and institutional controls. The scope of work activities will be completed in two phases to excavate approximately 15,200 tons of soil: Phase will consist of excavation and stockpiling soil with containment concentrations above cleanup goals from Parcels 1L 3,400 tons; 2: 4,100 tons and 3a: 7,700 tons; Phase 2 will consist of removing stockpiled soil for off-site disposal or treatment and importing 28,600 tons of clean soil to be used to fill excavated areas; 15,200 for current excavation and 13,400 tons to backfill areas excavated in 2014. The implementation of the RAP remedial actions for soils within parcels 1, 2, and 3a, and groundwater will reduce the risk to human health and the environment.

Contact Information

Name
Sara Michael
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
LA Harbor
Zip
90731
Total Acres
20
Parcel #
7440-031-907, 032-904, 034-903
State Highways
47
Railways
UP Railroad
Schools
San Pedro and POLA HS
Waterways
LA Harbor
Township
5S
Range
13W
Section
S17
Other Location Info
San Pedro

Notice of Determination

Approving Agency
DTSC
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print