Pedro Point Headlands Restoration and Trail Improvement Project

4 Documents in Project

Summary

SCH Number
2016022068
Lead Agency
San Mateo County
Document Title
Pedro Point Headlands Restoration and Trail Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/31/2016
Present Land Use
San Mateo County: Open Space, RM-CZ/CD; City of Pacifica; Open-Space Residential, A/B-5
Document Description
The proposed Project is intended to minimize sediment transport to waterways through restoration of areas scarred by past off-road motorcycle use. Restoration would primarily involve the use of erosion and sediment control measures and native landscaping to improve the existing trail network on approx. 32.3 acres at Pedro Point Headlands. The Project would involve properly filling and eliminating existing gullies and trails cars; re-establishing the natural topography and positive drainage within highly eroded coastal bluff areas; restoring disturbed trails and gullies to coastal prairie and coastal scrub vegetation; propagating and salvaging native plants using volunteers; incorporating a trail design and construction plan to build sustainable trails; installing kiosks and signage; and establishing a temporarily native plant nursery on-site.

Contact Information

Name
Sam Herzberg
Agency Name
San Mateo County
Contact Types
Lead/Public Agency

Location

Cities
Pacifica
Counties
San Mateo
Cross Streets
Highway 1
Zip
94044
Total Acres
32.3
Parcel #
023-730-020, 040, 210, 220; 023
State Highways
1
Schools
Linda Mar. Edu. Center
Waterways
San Pedro Creek

Notice of Determination

Approving Agency
County San Mateo
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print