Santa Ana Sucker Habitat Restoration Project (Streambed Alteration Agreement No. 1600-2016-0038-R6)

2 Documents in Project

Summary

SCH Number
2016011064
Lead Agency
Orange County Water District
Document Title
Santa Ana Sucker Habitat Restoration Project (Streambed Alteration Agreement No. 1600-2016-0038-R6)
Document Type
NOD - Notice of Determination
Received
Posted
8/22/2016
Present Land Use
Open Space/ Open Space/ Open Space
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0038-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the Orange County Water District. The project is limited to the construction of ten below-grade and ten above-grad rock gabions in the Santa Ana River, as well as an access road and staging area. Five below-and above-grade gabions will be placed along the southern riverbank and five below- and above-grade gabions will be placed along the northern riverbank. For the placement of each gabion, an area will be excavated measuring five feet deep, twelve feet long, and three feet wide. A below-grade wire mesh gabion basket will be excavated measuring five feet deep, twelve feet long, and three feet wide. A below grade wire mesh gabion basket will be installed in the excavated area and will be filled with 7 cubic yards of rock material and secured. Subsequently, a 12 foot long by 3 foot wide by 3 foot deep gabion will be installed directly on top of the below grade gabion and filled with 4 cubic yards of rock material. A 20-foot wide temporary access road will be constructed from Archibald Avenue to the Santa Ana River, along with a 100-foot diameter staging area.

Contact Information

Name
Claire Ingel
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Norco
Counties
Riverside
Cross Streets
Archibald Avenue and Prado Basin Park Road
Total Acres
<1
Parcel #
130 090 004 130 080 007
Waterways
Santa Ana River
Township
3S
Range
7W
Section
11
Base
Corona

Notice of Determination

Approving Agency
CDFw
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print