Baker Pump Station Project

2 Documents in Project

Summary

SCH Number
2016011036
Lead Agency
El Toro Water District
Document Title
Baker Pump Station Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Zoning:Multi-Family Dwelling (R2)/General Plan: Low Medium Density Residential (7 to 15 DUs/Net AC)
Document Description
ETWD proposes to upgrade the existing Baker Pump Station to deliver a constant flow of 5.0 cubic feet per second into the ETWD's R-6 Pressure Zone (R-6 Zone). The Baker Pump Station is located in the ETWD's R-6 Zone. The proposed project would include demolition of the existing pump station building and construction of a new pump station on the same parcel. Pump station improvements include mechanical and electrical upgrades would upsize this pipeline to 16-inch pipeline to supply suction pressure to the pump station. The proposed 16-inch diameter pipeline would be installed from the proposed pump station building to the tee in El Toro Road for an approx. length of 45 linear feet. The ETWD R-6 Zone includes distribution piping and services and floats off the 275 million gallon R-6 Reservoir. Based on the analysis conducted for the proposed project, along with the pump station improvements, additional off-site improvements would be required to deliver water into the R-6 Zone. Off-site improvements would be required at three primary locations: 2nd Street, Grace Community Church, and Cherry Booster Station. improvements along 2nd Street would include installation of a 12-inch pipeline from the proposed pump station to Springwater for an approximate length of 650 feet. Other off-site improvements would include installation of flow meter, construction of interconnection, and check valve removal which would require minimal construction.

Contact Information

Name
Dennis Cafferty
Agency Name
El Toro Water District
Contact Types
Lead/Public Agency

Location

Counties
Orange
Cross Streets
El Toro Road, 2nd Street, Spring Water, Brookhaven, and Greenbank
Zip
92630
Total Acres
0.39
Parcel #
933-020-01
State Highways
I-5
Railways
Metrolink RR
Schools
Numerous
Waterways
Aliso Creek
Township
6S
Range
8W
Section
23
Base
SBBM
Other Location Info
Lake Forest

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 12 (DOT), California Highway Patrol, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Water Resources, Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Native American Heritage Commission (NAHC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC)
Development Types
Water Facilities (Type Pump station)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife, GHG

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print