Phase II Recycled Water Distribution System Expansion Project

4 Documents in Project

Summary

SCH Number
2016011034
Lead Agency
El Toro Water District
Document Title
Phase II Recycled Water Distribution System Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
2/29/2016
Present Land Use
Land Use: Local Streets: Zoning: No designation/Residential Community; GP: No designation/Adult Single and Multiple Family
Document Description
ETWD is proposing to expand the existing Recycled Water Distribution System to allow for delivery of up to 300 acre feet per year of additional tertiary-treated recycled water to existing dedicated irrigation customers within the ETWD service area. The proposed distribution system expansion project would be supplied by the existing tertiary treatment plant. As the lead agency under CEQA, the ETWD has prepared an IS/MND, which evaluates the potential environmental effects of the proposed Phase II Recycled Water Distribution System Expansion Project. The proposed project would include construction of approximately 28,500 ft or 5.4 miles of recycled water pipelines beneath existing roadways. The pipelines would require excavation depths of 5 to 7 ft within the existing paved roadways. There are existing utilities within these roadways at approximately 8 ft in depth. Once completed, the max amount of recycled water to be delivered to the project area would be 300 afy, and would remain within the permitted capacity of the existing ETWD water recycling plant. The system would be supplied from the existing Recycled Water Tertiary Treatment Plant at the ETWD WRP.

Contact Information

Name
Dennis Cafferty
Agency Name
El Toro Water District
Contact Types
Lead/Public Agency

Location

Cities
Laguna Woods
Counties
Orange
Cross Streets
El Toro Road, Via Carrizo, Monte Hermoso, Paseo De Valencia, and Avenida De La Carlota
Zip
92637
Total Acres
5.4
Parcel #
Various
State Highways
I-5
Schools
San Joaquin Elem.
Waterways
Veeh Reservoir
Township
6S
Range
7W
Section
9
Base
SB

Notice of Determination

Approving Agency
El Toro Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print