McCullin On-Farm Flood Capture (Streambed Alteration Agreement No .1600-2016-0215-R4)
4 Documents in Project
Summary
SCH Number
2016011031
Lead Agency
Kings River Conservation District
Document Title
McCullin On-Farm Flood Capture (Streambed Alteration Agreement No .1600-2016-0215-R4)
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2017
Present Land Use
AE-20-Exclusive Agricultural
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2016-0215-R4, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Kings River Conservation District.
The project includes the construction of a new water control structure in the Fresno slough Bypass at the connection with Main Canal (Terranova Canal), and diversion of flow via the water control structure for irrigation and groundwater recharge purposes, using a system of canals over approx. 6,000 acres of existing farmland.
Contact Information
Name
Carrie Swanbeg
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Kerman
Counties
Fresno
Cross Streets
SR 145 @ W. Floral Ave.
Zip
93627
Total Acres
6,000
Parcel #
040-050-04
State Highways
145
Waterways
James Bypass
Township
16S
Range
17E
Section
2
Base
MDB&M
Other Location Info
Helm
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.