San Elijo Land Outfall Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0028-R5)

5 Documents in Project

Summary

SCH Number
2016011018
Lead Agency
San Elijo Joint Powers Authority
Document Title
San Elijo Land Outfall Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0028-R5)
Document Type
NOD - Notice of Determination
Received
Posted
9/15/2016
Present Land Use
Public/Semi Public, Ecological Reserve/Open Space/Park, Public Right-of-Way, Transportation Corridor
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0028-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, San Elijo Joint Powers Authority. The project will replace the land outfall portion of an existing outfall system. The new land outfall pipeline will extend west from the existing outfall system at the SEWRF. The pipe will travel approx. 2,500 linear feet under Manchester Ave., the San Elijo Lagoon Nature Center parking lot, San Elijo Lagoon, railroad tracks, Pacific Coast Highway 101, and connect to the existing outfall at Cardiff State Beach. Installation of the majority of the new pipeline will be conducted using horizontal directional drilling (HDD). No impacts to streams or wetland habitat are proposed or anticipated, except for the identified impact to the existing concrete-lined stream near the SEWRF. However, it is possible that an inadvertent surface return ("frac-out") could enter into San Elijo Lagoon if pressure created by the boring/drilling forces water/drilling mud mixture through a weak point in the geologic formation. In the event a frac-out enters the lagoon, habitat restoration will occur to restore temporarily impacted areas.

Contact Information

Name
Kevin Hupf
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Encinitas
Counties
San Diego
Cross Streets
Manchester Ave./ San Elijo Water Reclamation Facility/ San Elijo Lagoon Visitor Center
Zip
92007
State Highways
I-5
Railways
NCTD
Schools
Cardiff Elem.
Waterways
San Elijo Lagoon, Pacific Ocean
Township
13S
Range
4W
Section
26/27
Base
Enc
Other Location Info
Cardiff by the Sea

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print