San Elijo Land Outfall Replacement Project

5 Documents in Project

Summary

SCH Number
2016011018
Lead Agency
San Elijo Joint Powers Authority
Document Title
San Elijo Land Outfall Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2016
Present Land Use
Public/Semi Public, Ecological Reserve/Open Space/Park, Public Right-of-Way, Transportation Corridor
Document Description
The project proposes to replace the existing San Elijo land outfall pipeline that runs from the San Elijo Water Reclamation Facility (SEWRF) to the existing ocean outfall to the Pacific Ocean. The land portion of the outfall system consists of approx. 800 linear feet of 30-inch diameter polyvinyl chloride (PVC) pipeline that was installed in 1999 and extends southward from the SEWRF to just north of Manchester Avenue. From there, the land outfall extends approx. 2,500 LF across Manchester Ave., underneath San Elijo Lagoon in a southwest trending alignment with a 30-inch diameter asbestos cement (AC) pipeline that was installed in 1965.

Contact Information

Name
Alan Monji
Agency Name
RWQCB - San Diewgo Region
Contact Types
Lead/Public Agency

Location

Cities
Encinitas
Counties
San Diego
Cross Streets
Manchester Ave./ San Elijo Water Reclamation Facility/ San Elijo Lagoon Visitor Center
Zip
92007
State Highways
I-5
Railways
NCTD
Schools
Cardiff Elem.
Waterways
San Elijo Lagoon, Pacific Ocean
Township
13S
Range
4W
Section
26/27
Base
Enc
Other Location Info
Cardiff by the Sea

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print