Inyo County Eastern California Museum Expansion; SCH#2015121014

2 Documents in Project

Summary

SCH Number
2015121014
Lead Agency
Inyo County
Document Title
Inyo County Eastern California Museum Expansion; SCH#2015121014
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2016
Present Land Use
Open Space Recreational (OSR) and Public Facilities (PF)/Open Space 40-Acre Minimum (OS-40) and Public (P)
Document Description
The Proposed Engine House will be a 40'wide x 75' long structure. The structure will be used to store, maintain, display, and operate Engine 18 and other railroad artifacts. Approx. 130 lineal feet of usable track will be laid inside the Engine House with approx. 1,000 lineal feet of exterior track. Interior improvements: may include a concrete slab, may include work bench and other equipment for maintenance and restoration work, may include bathroom facilities, may include break/meeting room, two track lines, electrical outlets/lighting, etc. Part of the new exterior tracks will be placed in areas designated Open Space & Recreation and zoned Open Spaces. The portion of the Eastern CA Museum that is zoned and designated Open Space will be rezoned to Public and re-designated.

Contact Information

Name
Clint Quilter
Agency Name
Inyo County
Contact Types
Lead/Public Agency

Location

Counties
Inyo
Cross Streets
N. Grant & W. Market St. (Onion Valley Rd)
Zip
93526
Total Acres
9.4
Parcel #
022-140-16-02
State Highways
395
Airports
Independence Airport
Schools
Owens Valley Unified
Waterways
Independence Creek, Independence Ditch
Township
13S
Range
35E
Section
18
Base
MDM
Other Location Info
Independence

Notice of Determination

Approving Agency
Inyo County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print