Venice Auxiliary Pumping Plant Project

4 Documents in Project

Summary

SCH Number
2015111038
Lead Agency
City of Los Angeles
Document Title
Venice Auxiliary Pumping Plant Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Residential/Medium Residential/RW2-1
Document Description
Construction of an auxiliary pumping plant and associated facilities in support fo the existing Venice Pumping plant (VPP). The proposed project would provide additional reliability and critical redundancies necessary to support the City of Los Angeles' wastewater conveyance and processing system. It would be a sized to supplement the pumping capacity of the VPP for a combined ultimate peak flow of 87 million gallons per day (mgd), reflecting wet weather flows of a 10-year storm event. Temporary and permanent closure (vacation) of Hurricane Street between Canal Court and Esplanade would be required. A portion of Canal Court (northern property boundary to Ballona Lagoon) would also be temporarily closed during construction. Two laydown areas (southwest and east of the proposed project) would be used during construction.

Contact Information

Name
Jan Green Rebstock
Agency Name
City of Los Angeles
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Hurricane Street/Canal Court
Zip
90292
Total Acres
0.18
Parcel #
4225008904, 4225008904
State Highways
Pacific Coast Highway
Schools
Westside Global Magnet
Waterways
Ballona Lagoon, Venice Canal, Pacific Ocean
Township
2S
Range
15W
Section
1
Base
Venice

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coastal Commission (CCC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights, California Department of Transportation, District 7 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 7 (DOT)
Development Types
Industrial (Sq. Ft. 7,850), Water Facilities (Type Pumping Plant), Other (Constuction of new auxiliary wastewater pumping plant)
Local Actions
Master Plan, Rezone, Use Permit, Public Facility
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Cumulative Effects: Findings of Signif.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print