Mountain View Connector Pipeline Project ADDENDUM NO. 1 to the Comprehensive Facilities Master Plan Final Environmental Impact Report

4 Documents in Project

Summary

SCH Number
2015111014
Lead Agency
Padre Dam Municipal Water District
Document Title
Mountain View Connector Pipeline Project ADDENDUM NO. 1 to the Comprehensive Facilities Master Plan Final Environmental Impact Report
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2019
Document Description
The project proposes minor design modifications to the Mountain View Connector Pipeline Project, a potable water pipeline project that was included, described, and analyzed in the District's previously certified Comprehensive Facilities Master Plan (CFMP) Environmental Impact Report (BIR) as project R-4B. During design, minor modifications were made to improve water reliability and access. The proposed minor modifications include: ( 1) a different pipeline alignment along Frances Drive and Harbinson Canyon Road; (2) a different connection point at the Mountain Top Reservoir Site; and (3) an increase in pipeline diameter of four inches (from 12 inches to 16 inches). In addition to these modifications, the project will also now include 6,900 square yards of pavement repairs in Mountain View Road and Frances Drive.

Contact Information

Name
Mark Niemiec
Agency Name
Padre Dam Municipal Water District
Contact Types
Lead/Public Agency

Name
Agency Name
Padre Dam Municipal Water District
Contact Types
Project Applicant

Location

Counties
San Diego
Other Location Info
Identify street address and cross street or attach a map showing project site (preferably a USGS 15' or 7 ½' topographical map identified by quadrangle name): Within the Padre Dam Municipal Water District's Eastern Service Area, in unincorporated San Diego County, and primarily occurring within Frances Drive, Harbison Canyon.Road, Mountain View Road, and at the site of the Mountain Top Reservoir Site. See attached Figures 1 (Project Location) and 2 (Mountain View Road Pipeline Alignment).

Notice of Determination

Approving Agency
Padre Dam Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print