Iliev Water Diversion, Stream Crossings, and Stream Remediation Project (Lake or Streambed Alteration Agreement No. 1600-2017-0705-R1)

739 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Iliev Water Diversion, Stream Crossings, and Stream Remediation Project (Lake or Streambed Alteration Agreement No. 1600-2017-0705-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/5/2018
Present Land Use
The project applies across all land use designations
Document Description
Project is limited to three encroachments. One encroachment is for water diversion from an unnamed tributary to the South Fork Salmon Creek. Water is diverted for domestic use. Work for the water diversion will include removal of the existing structure, replacement with a new CDFW approved structure, and future use and maintenance of the water diversion infrastructure. A proposed encroachment will upgrade an existing culvert. Work for this encroachment will include excavation, removal of and replacement with new culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. The last encroachment will remediate a stream that was diverted by unpermitting grading. The stream will be relocated to the original channel. Work for this project will include excavation, establishment of a new channel, grade control installation, and revegetation.

Contact Information

Name
David Manthorne
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
Whitehorn

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print