Mahoney Stream Crossings, Micro-Hydro, and Stream Remediation Project (Lake or Streambed Alteration Agreement NO. 1600-2016-0166-R1)

786 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Mahoney Stream Crossings, Micro-Hydro, and Stream Remediation Project (Lake or Streambed Alteration Agreement NO. 1600-2016-0166-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2018
Present Land Use
The project applies across all land use designations
Document Description
The project includes twenty two encroachments. Four encroachments are for water diversion projects including removal of old intakes, and installation of new micro-hydro power generation system. Water will be diverted from up to two Class II streams. Work for the water diversion projects include removal of two cisterns, installation of a new micro hydro system, use and maintenance of the water diversion infrastructure as needed as backup to groundwater well. Eighteen additional encroachments are proposed to upgrade, replace, or improve road/stream crossings or impacts to Class II and III watercourses. Work for these projects will include excavation, removal of fill installation of new culverts, placement of rock armoring, revegetation, and erosion control as necessary to minimize erosion.

Contact Information

Name
David Manthorne
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
Miranda

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.