Balletta Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0334-R1)
809 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Balletta Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0334-R1)
Document Type
NOD - Notice of Determination
Received
Posted
5/18/2018
Present Land Use
The project applies across all land use designations
Document Description
Project is limited to 5 encroachments. Encroachment 1 is for water diversion from a Class II stream using a spring box. Work for the water diversion will include replacement and maintenance of diversion infrastructure. The existing spring box will be removed from the center of the channel and a spring box 18" in diameter or less will be placed near the stream bank. Water is diverted for domestic use. Encroachment 2 (POD 2a) is for water diversion from the main stem Mattole River using an appropriately screened and placed submersible pump. Use of POD 2a will be discontinued when POD 2b (Encroachment 3) is installed in 2018. Water will be diverted for irrigation. Encroachment 3 is for installation and use of an offset well (approx. 8-10 inches in diameter 30 feet deep) on the floodplain of the main stem Mattole River. Water will be diverted for irrigation. Encroachment 4 is for the removal and decommissioning of an existing stream crossing (failing 12" diameter culvert) on an old ATV trail currently in use as a foot path. Work for this encroachment will include removal of the culvert and fill associated with the crossing. Encroachment 5 is for replacement of an existing wooden bridge with an 18" diameter x 20' long culvert. Work for this encroachment will include removal of the bridge, removal of associated fill, and installation of a new appropriately sized culvert.
Contact Information
Name
Angela Liebenberg
Agency Name
CDFW
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Humboldt
Other Location Info
Dinsmore
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.