Water Diversion and Revegetation and Restocking Plan (Lake or Streambed Alteration Agreement No. EPIMS-HUM-54004-R1C)

810 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Water Diversion and Revegetation and Restocking Plan (Lake or Streambed Alteration Agreement No. EPIMS-HUM-54004-R1C)
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2024
Document Description
The Project is limited to two encroachments. One encroachment is for water diversion from Blue Slide Creek. Water is diverted for domestic use only. Work for the water diversion will include annual installation and removal, use, and maintenance of the water diversion infrastructure. The other proposed encroachment is to revegetate and restock two locations totaling approximately 48,750 ft2 and along 325 feet of stream to restore native riparian vegetation lost through unauthorized activities.

Contact Information

Name
Joshua Gruver
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Redway
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 6.8 miles west of the town of Redway
Parcel #
221-221-016-000
Waterways
Upper Mattole River watershed
Township
04S
Range
02E
Section
9
Base
Humboldt

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501 Contact: Steven Lazar Phone: 707-445-7245

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print