Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-49496-R1C)
786 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-49496-R1C)
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2024
Document Description
The Project is limited to one encroachment. The single proposed encroachment is to maintain an existing culvert. Work for this encroachment will include maintenance and clearing of the inlet and outlet with hand tools only. Currently the inlet is clear of sediment and in good condition, but the outlet needs sediment cleared and potentially addition of rock armoring to stabilize the fill and decrease the perch height. If Permittee cleans the outlet and it is determined the culvert is rusted through, a new culvert shall be installed set to grade including excavation, removal of the existing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
Contact Information
Name
Joshua Gruver
Agency Name
CA Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Address
Phone
Location
Coordinates
Cities
Dinsmore
Counties
Humboldt
Regions
Northern California
Parcel #
208-341-005
Waterways
Mill Creek - Van Duzen River Watershed
Township
1N
Range
5E
Section
11
Base
Humboldt
Other Location Info
approximately 1.8 miles east of the town of Dinsmore
Notice of Determination
Approving Agency
CA Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building
3015 H Street
Eureka, CA 95501
Contact: Steven Lazar
Phone: 707-445-7245
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.