Stream Crossing Decommissionings (Lake or Streambed Alteration Agreement No. EPIMS-HUM-51027- R1C)

783 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Stream Crossing Decommissionings (Lake or Streambed Alteration Agreement No. EPIMS-HUM-51027- R1C)
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2024
Document Description
The Project is limited to three encroachments. The three proposed encroachments are to decommission stream crossings. Work for these encroachments will include pulling back the stream banks to no greater than a 2:1 slope. Seed and straw shall be applied to prevent erosion and sediment delivery while revegetation of the banks occurs. MP-2 will require excavation and temporary displacement of approximately 18.5 cubic yards of fill. MP-3 will require approximately 9.5 cubic yards, and MP-4 will require approximately 26 cubic yards of displacement. All spoils shall be stored upslope from streams where it cannot enter the stream system.

Contact Information

Name
Joshua Gruver
Agency Name
CA Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Myers Flat
Counties
Humboldt
Regions
Northern California
Parcel #
211-374-013-000
Waterways
Canoe Creek - South Fork Eel River Watershed
Township
2S
Range
3E
Section
23
Base
Humboldt
Other Location Info
approximately 3.4 miles northeast of the town of Myers Flat

Notice of Determination

Approving Agency
CA Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501 Contact: Steven Lazar Phone: 707-445-7245

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print