Water Diversion, Stream Crossings, and Pond Spillway Armoring Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-35067-R1C)

809 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Water Diversion, Stream Crossings, and Pond Spillway Armoring Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-35067-R1C)
Document Type
NOD - Notice of Determination
Received
Posted
7/30/2024
Document Description
The Project is limited to four encroachments. One encroachment is for water diversion from Mountain Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include installation, use, and maintenance of the water diversion infrastructure. One proposed encroachment is for the armoring of a pond spillway. Additional rock armoring shall be placed to minimize erosion and stabilize the channel. Two other proposed encroachments are to upgrade or repair existing culverts. Work for these encroachments will include excavation, removal of the existing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Joshua Gruver
Agency Name
CA Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Miranda
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 10.8 miles northeast of the town of Miranda
Parcel #
217-255-005
Waterways
Upper Larabee Creek watershed
Township
2S
Range
5E
Section
17
Base
Humboldt

Notice of Determination

Approving Agency
CA Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501 Contact: Steven Lazar Phone: 707-445-7245

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print