Water Diversions, Stream Crossings, and Pond Spillway Projects (Lake or Streambed Alteration Agreement No. EPIMS-HUM-39041-R1C)
812 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Water Diversions, Stream Crossings, and Pond Spillway Projects (Lake or Streambed Alteration Agreement No. EPIMS-HUM-39041-R1C)
Document Type
NOD - Notice of Determination
Received
Posted
7/16/2024
Document Description
The Project is limited to fourteen encroachments. Three encroachments are for water diversions (two from offset shallow wells and one on-stream pond). Water is diverted for domestic use from POD-A and POD-B1/B2 and irrigation is sourced from POD-C/Pond-3. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The eleven other proposed encroachments are to upgrade existing culverts, install rock armored fords, construct pond spillways, and decommission a pond. Work for these encroachments will include excavation, removal of the existing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Work will also include engineered plans and construction activities for construction of spillways and decommissioning of a failing pond.
Contact Information
Name
Joshua Gruver
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Coordinates
Cities
Harris
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 4.4 miles southeast of the town of Harris
Parcel #
218-051-002-000, 218-051-003-000, 218-051-006-000, and 218-051-007-000
Waterways
Pipe Creek – Eel River watershed
Township
05S
Range
05E
Section
10
Base
Humboldt
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building
3015 H Street
Eureka, CA 95501
Contact: Steven Lazar
Phone: 707-445-7245
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.