Phillip Stream Crossings Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-25319)
797 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Phillip Stream Crossings Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-25319)
Document Type
NOD - Notice of Determination
Received
Posted
9/20/2023
Document Description
The Project is limited to three (3) encroachments. One proposed encroachment will remove a
legacy diversion infrastructure from a spring channel. The cistern shall be excavated and removed, including all poly pipe
associated with the defunct diversion. Clean, washed rock shall be used to backfill the hole when the infrastructure is
removed. Two other proposed encroachments are to upgrade existing culverts. Work for these encroachments will
include excavation, removal of the existing culverts, replacement with new properly sized culverts, backfilling and
compaction of fill, and rock armoring as necessary to minimize erosion.
Contact Information
Name
Joshua Gruver
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Coordinates
Cities
Willow Creek
Counties
Humboldt
Regions
Northern California
Cross Streets
2.5 miles northeast of the town of Willow Creek
Parcel #
523-026-004-000
Waterways
Campbell Creek - Trinity River watershed
Township
07N
Range
05E
Section
22
Base
Humboldt
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building
3015 H Street
Eureka, CA 95501
Contact: Steven Lazar
Phone: 707-445-7245
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.