Zaboli Pond, Culvert Replacement and Water Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2017-0465-R1)
539 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Zaboli Pond, Culvert Replacement and Water Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2017-0465-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/13/2018
- Present Land Use
- The project applies across all land use designations
- Document Description
- Project is limited to 3 encroachments. One encroachment is for pond spillway maintenance and improvement and possible use for storage for cannabis cultivation and domestic household use once a small use registration is available in the watershed and approved, one diversion is for a culvert replacement and one diversion is for watershed and approved. The pond spillway will be rock armored to prevent erosion and sediment deposition and other maintenance conducted as necessary. The 18-inch undersized and failing culvert will be replaced with appropriately sized culvert, positioned to grade, armored at the inlet and outlet with a critical dip installed as appropriate. The diversion is for a spring fed cistern catchment where water will be diverted for domestic household and cannabis irrigation use. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Two additional historically placed and properly functioning culvert exists on the property and do not require notification.
- Contact Information
-
Cheri Sanville
CDFW
Lead/Public Agency
619 Second St.
Eureka, CA 95501
Phone : (707) 964-4830
Location
- Counties
- Humboldt
- Other Location Info
- Alderpoint
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 619 Second St., Eureka, CA 95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.