Zaboli Pond, Culvert Replacement and Water Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2017-0465-R1)

201 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Zaboli Pond, Culvert Replacement and Water Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2017-0465-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
Project is limited to 3 encroachments. One encroachment is for pond spillway maintenance and improvement and possible use for storage for cannabis cultivation and domestic household use once a small use registration is available in the watershed and approved, one diversion is for a culvert replacement and one diversion is for watershed and approved. The pond spillway will be rock armored to prevent erosion and sediment deposition and other maintenance conducted as necessary. The 18-inch undersized and failing culvert will be replaced with appropriately sized culvert, positioned to grade, armored at the inlet and outlet with a critical dip installed as appropriate. The diversion is for a spring fed cistern catchment where water will be diverted for domestic household and cannabis irrigation use. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Two additional historically placed and properly functioning culvert exists on the property and do not require notification.

Contact Information
Cheri Sanville
CDFW
619 Second St.
Eureka, CA 95501

707-964-4830

Location

Counties
Humboldt
Other Location Info
Alderpoint

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second St., Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No