Canada Dogwood Water Diversion and Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-15255-HUM-R1)
797 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Canada Dogwood Water Diversion and Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-15255-HUM-R1)
Document Type
NOD - Notice of Determination
Received
Posted
10/15/2021
Document Description
The project consists of 10 encroachments: The project is limited to 10 encroachments. Four encroachments are for water diversion from unnamed tributaries to Panther Creek. Water is diverted for irrigation. Work for the water diversion will include use, maintenance, and upgrading for POD’s 5 and 6. Work for POD 7 old S025100 and POD 8 old S025099 will include the decommissioning of the water diversion’s infrastructure and returning to natural conditions. The 6 other proposed encroachments are to upgrade failing and undersized stream crossings. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
Contact Information
Name
Cheri Sanville
Agency Name
California Department of Fish & Wildlife
Contact Types
Responsible Agency
Address
Phone
Location
Coordinates
Cities
Bridgeville
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 12.7 miles south east of the town of Bridgeville
Parcel #
410-162-007 and 410-162-008
Waterways
Lower Eel River Watershed
Notice of Determination
Approving Agency
California Department Of Fish & Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building
3015 H Street
Eureka, CA 95501
Contact: Steven Lazar
Phone: 707-445-7245
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.