Cabral Water Diversion, Stream Crossings, and Micro-hydroelectric Power Project (Lake or Streambed Alteration Agreement No. 1600-2019-0953-R1

798 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Cabral Water Diversion, Stream Crossings, and Micro-hydroelectric Power Project (Lake or Streambed Alteration Agreement No. 1600-2019-0953-R1
Document Type
NOD - Notice of Determination
Received
Posted
9/16/2021
Document Description
The project is limited to 12 encroachments (projects). One project is for water diversion from an Unnamed Tributary to Big Finley Creek for domestic use; work includes use and maintenance of structure. One project is for water diversion from an Unnamed Tributary to Big Finley Creek for micro-hydroelectric power generation, work includes use and maintenance of diversion structure. One project is to install a rocked ford stream crossing; work includes rock armoring to prevent sediment delivery/erosion. Three projects are to upgrade undersized culverts and restore the streambank; work includes excavation, removal of culverts, replacement with properly sized culverts, backfilling/compaction, rock armoring, and reshaping/revegetation of the streambank. The remaining six projects include adding rock armor to existing culvert stream crossing outlets and existing fords.

Contact Information

Name
Kalyn Bocast
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Cities
Whitethorn
Counties
Humboldt
Regions
Northern California
Parcel #
108-071-003
Other Location Info
The project to be completed is located within the Mattole River watershed, approximately two miles west of the town of Whitethorn, County of Humboldt, State of California. The project is located in Section 36, T4S, R1E, Humboldt Base and Meridian; in the Shelter Cove U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 108-071-003; latitude 40.0743 N and longitude 124.0113 Wat the Parcel Centroid.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept, of Planning and Building 3015 H Street Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.