Tolan Water Diversions and Stream Crossings Project (1600-2020-0347-R1)

797 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Tolan Water Diversions and Stream Crossings Project (1600-2020-0347-R1)
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2021
Document Description
The project is limited to two encroachments. One encroachment is for water diversion from unnamed tributaries to Little Burr Creek. Water is diverted for domestic use only. Work for the water diversion will include improvements, use, and maintenance of the water diversion infrastructure. The other encroachment is to restore a stream to natural conditions. Work for these encroachments will include excavation, removal of cultivation structures and fill, excavating channel to natural streambed, laying back slopes 2:1, and revegetation of banks, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Christine Hahn Vertical
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Cities
Bridgeville
Counties
Humboldt
Regions
Northern California
Parcel #
208-321-008
Other Location Info
The project to be completed is located within the Lower Eel River watershed, approximately 3.89 miles SE of the town of Bridgeville, County of Humboldt, State of California. The project is located on Assessor’s Parcel Numbers 208-321-008; latitude 40.4275 N and longitude -123.7392 W at the first point of diversion (POD).

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print