Mulder Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0702-R1)
527 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Mulder Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0702-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/1/2018
- Present Land Use
- The project applies across all land use designations
- Document Description
- Project consists of four encroachments: Two encroachments are to upgrade undersized culverts. Work for these encroachments will include excavation, removal of the undersized culverts, replacement with new properly sized corrugated metal culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One proposed encroachment is to upgrade a dirt ford to a rocked ford. Work for this encroachment will include rock armoring as necessary to minimize erosion. One proposed encroachment is to rock armor the outlet of a wetland that is down cutting through remnant fill material deposited from historic logging practices. Work for this encroachment will include rock armoring as necessary to minimize erosion.
- Contact Information
-
Kalyn Bocast
CDFW
619 Second St.
Eureka, CA 95501
Phone : (707) 441-2077
Location
- Counties
- Humboldt
- Other Location Info
- Myers Flat
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 619 Second Street, Eureka, CA 95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.