Michaels Onstream Pond Project (Lake or Streambed Alteration Agreement No. 1600-2020-0374-R1)
798 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Michaels Onstream Pond Project (Lake or Streambed Alteration Agreement No. 1600-2020-0374-R1)
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2021
Document Description
The project is limited to one (1) encroachment.The encroachment is an existing onstream pond and outfall, which obstructs and impounds the natural flow of the stream/spring which is tributary to Fourmile Creek. Water is not diverted for domestic or irrigation purposes. Work for the project includes maintenance of the existing pond and outfall.
Contact Information
Name
Cheri Sanville
Agency Name
CDFW
Contact Types
Responsible Agency
Address
Phone
Location
Cities
Whitethorn
Counties
Humboldt
Regions
Northern California
Other Location Info
The project is located within the Fourmile Creek watershed, approximately 10 miles NW of the town of
Whitethorn, County of Humboldt,State of California; Section 29, Township 03S, Range 01E, Humboldt Base and
Meridian, in the Honeydew U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 107-251-004;
latitude 40.1767 N and longitude 124.0872 W at the pond outfall.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building
3015 H Street
Eureka, CA 95501
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.