Edwards Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0488-R1)
539 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Edwards Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0488-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/1/2018
- Present Land Use
- The project applies across all land use designations
- Document Description
- Project consists of seven encroachments: Three encroachments are for water diversion from unnamed tributaries to Chamise Creek. Water from POD C is diverted for domestic use. Work for this water diversion will include facility retrofit, use, and maintenance of the water diversion infrastructure. Water from POD A and POD B is diverted for irrigation. Work for these water diversions will include use and maintenance of the water diversion infrastructure. The four other proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
- Contact Information
-
Kalyn Bocast
CDFW
Lead/Public Agency
619 Second St.
Eureka, CA 95501
Phone : (707) 441-2077
Location
- Counties
- Humboldt
- Other Location Info
- Garberville
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 619 Second St., Eureka, CA 95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.