Platz Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0590-R1)
559 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102005
- Lead Agency
- Humboldt County
- Document Title
- Platz Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0590-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/1/2018
- Present Land Use
- The project applies across all land use designations
- Document Description
- Project is limited to 4 encroachments. One encroachment is for water diversion from a Class 2 spring that is not hydrologically connected by surface flow to Frenchman Creek. Water is diverted from a 12 inch concrete cistern and transferred to storage for domestic use and irrigation. A second encroachment is to replace a 12-inch and 18-inch culvert system with a single appropriately size 24-inch culvert. A third encroachment is to replace a 12-inch culvert with an appropriately sized 18-inch culvert. A fourth encroachment is to decommission a dirt fill crossing to restore a class III watercourse to its natural channel. Work for the water diversion and stream crossing will include use and maintenance of the infrastructure.
- Contact Information
-
Angela Liebenberg
CDFW
Lead/Public Agency
619 Second St.
Eureka, CA 95501
Phone : (707) 964-4830
Location
- Counties
- Humboldt
- Other Location Info
- Alderpoint
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 619 Second St., Eureka, CA 95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.