Wansick Water Diversion and Stream Crossings Project 2 Encroachments (Lake or Streambed Alteration Agreement No. 1600-2019-0399-R1)
798 Documents in Project
Summary
SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Wansick Water Diversion and Stream Crossings Project 2 Encroachments (Lake or Streambed Alteration Agreement No. 1600-2019-0399-R1)
Document Type
NOD - Notice of Determination
Received
Posted
12/29/2020
Document Description
This Agreement relies on the Notification materials a desk review without a CDFW site inspection. The project is limited to two encroachments (Table 1). One encroachment is for water diversion from unnamed spring from North Fork China Creek tributary to China Creek. Water is diverted for domestic use only. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The other proposed encroachment is to maintain the existing 48” corrugated metal pipe culvert. It is described as showing some wear on the bottom but, is still serviceable for at least 5 years. No work for this encroachment is authorized for replacement, only maintenance. If work is required it cannot be considered under CDFG Code 1610 as an emergency. If work becomes necessary during the terms of this Agreement an amendment would become necessary to cover replacement.
Contact Information
Name
Christine Hahn Vertical
Agency Name
California Department of Fish & Wildlife
Contact Types
Lead/Public Agency
Address
Phone
Name
Agency Name
Martin Wansick
Contact Types
Project Applicant
Location
Coordinates
Cities
Redway
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 6.4 miles SW of the town of Redway,
Zip
95560
Parcel #
220-052-013
State Highways
Highway 101
Waterways
Eel River Watershed
Township
04S
Range
02E
Section
14
Base
Humboldt
Notice of Determination
Approving Agency
Cheri Sanville-CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.