Pena Water Diversion and Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0673-R1)

789 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Pena Water Diversion and Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0673-R1)
Document Type
NOD - Notice of Determination
Received
Posted
3/1/2018
Present Land Use
The project applies across all land use designations
Document Description
Project is limited to 9 encroachments. One encroachment is to upgrade an undersized crossing from an 18 inch to a 30 inch diameter. A second encroachment is to upgrade an undersized culvert from an 18 inch to a 30 inch diameter. A third encroachment is to improve low water crossing on a class III watercourse to a rocked ford. A fourth encroachment is to improve a functioning and appropriately sized 18 inch culvert by rocking the ford. A fifth encroachment is to decommissioning an undersized and nonfunctioning 6-inch culvert. A sixth encroachment is to decommission a low water crossing on a class II watercourse. A seventh encroachment is for water diversion from unnamed class III intermittent spring tributary to South Fork Eel River. Water is diverted for household domestic and cannabis cultivation use from a cistern to storage. An eighth encroachment is to decommission two watercourse crossings, a road segment and two graded flats. A ninth encroachment is to remediate a water storage site b armoring the cut slope with rip rap, armoring ditch relief channel with rip-rap and installing native vegetation along ditch relief and in proximity to a class II watercourse. Work for the water diversion and stream crossings will include use and maintenance of the infrastructure.

Contact Information

Name
Angela Liebenberg
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
Alderpoint

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print