Sanders Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No.1600-2018-0234-R1

786 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Sanders Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No.1600-2018-0234-R1
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2020
Document Description
The project is limited to 20 encroachment(s). Four (4) encroachments are for water diversion from unnamed tributaries to the South Fork Eel River. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Fifteen (15) encroachments are to upgrade failing and/or undersized stream crossings. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One (1) encroachment is to reconstruct the spillway of an onstream pond, and reroute upslope surface flow to the watercourse downstream of the pond during the dry season.

Contact Information

Name
Nicholas Simpson
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Trent Sanders
Contact Types
Project Applicant

Location

Cities
Redway
Counties
Humboldt
Regions
Northern California
Other Location Info
The project to be completed is located within the South Fork Eel River watershed, approximately 2 miles northeast of the town of Redway, County of Humboldt, State of California. The project is located in Section 6, T4S, R4E, Humboldt Base and Meridian; in the Miranda U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Numbers 223-141-010 and 223-141-012.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print