Mussey Reed Mountain Water Diversion and Stream Crossings Project (Lake or Streambed Alteration

763 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Mussey Reed Mountain Water Diversion and Stream Crossings Project (Lake or Streambed Alteration
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2020
Document Description
The project is limited to 5 encroachments. One (1) encroachment is for water diversion from an unnamed tributary to Milk Ranch Creek. Water is diverted for irrigation. Work for the water diversion will include upgrading the diversion to the specifications set forth in this agreement and use and maintenance of the water diversion infrastructure. Two (2) other proposed encroachments are to install new culverts and one (1) additional encroachment is to upgrade an undersized culvert. Work for these encroachments will include excavation, removal of the undersized culvert (for Crossing 3), installation of new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One (1) additional encroachment is to remove sediment and debris from an existing culvert.

Contact Information

Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Chad Mussey
Contact Types
Project Applicant

Location

Cities
Garberville
Counties
Humboldt
Regions
Northern California
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 6.5 miles southeast of the town of Garberville, County of Humboldt, State of California. The project is located in Section 21, T5S, R4E, Humboldt Base and Meridian; in the Harris U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 223-032-004; latitude 40.010087 N and longitude 123.738839 W.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.