Quintero Stream Crossings Project (Lake or Streambed Alteration Agreement no. 1600-2017-0207-R1)

809 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Quintero Stream Crossings Project (Lake or Streambed Alteration Agreement no. 1600-2017-0207-R1)
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2017
Present Land Use
The project applies across all land use designations
Document Description
Project consists of four encroachment(s): Two encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One encroachment is to augment an existing culvert. Work for this encroachment will include rock armoring of the culvert inlet and outlet and rock armoring of the road approaches, 25 feet in each direction of the crossing. One encroachment is to upgrade a dirt ford. Work for this encroachment will include removal of debris and refuse, compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Angela Liebenberg
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
Weitchpec

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print