: Barakov Diversion, Bridge, Pond Project (Lake or Streambed Alteration Agreement No. 1600-2018-0189-R1)

504 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
: Barakov Diversion, Bridge, Pond Project (Lake or Streambed Alteration Agreement No. 1600-2018-0189-R1)
Document Type
NOD - Notice of Determination
Received
Posted
11/4/2020
Project Applicant
Stoyan Barakov

Document Description
The project is limited to 3 encroachments. One encroachment is for water diversion from unnamed tributaries to Thompson Creek. Water is diverted to storage for domestic household and cannabis cultivation use. A second encroachment is to place a 45 foot flat car bridge across Thompson Creek to decommission a wet ford impacting fish and wildlife resources. A third encroachment is to replace a shot-gunned 18 inch culvert with a new minimum 18 inch culvert on a pond that will be appropriately aligned with a stream channel. The Permittee has disclosed an on stream pond not being used that requires no project, a well to be used for cannabis cultivation use, and a properly functioning 18 inch ditch relief culvert. Work for the projects will include use and maintenance of the infrastructure

Contact Information
Kalyn Bocast
CDFW
619 Second Street
Eureka, CA 95501

Phone : (707) 441-2091
kalyn.bocast@wildlife.ca.gov

Location

Cities
Mad River
Counties
Humboldt
Regions
Northern California
Other Location Info
The project to be completed is located within the Van Duzen River watershed, approximately 5.5 miles south and east of the town of Mad River, County of Humboldt, State of California. The project is located in Section 34, T1N, R5E, Humboldt Base and Meridian; in the Dinsmore U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Numbers 210-131-01; 210-131-20; 210-131-19 latitude 40.4273 N and longitude -123.6006 W at the point of diversion (POD).

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
R__ALL_HABCON_LSA_AGREEMENT FILES_1600 2018_1600-2018-0189-R1_HUM_MJ Peshunov Barryland Farm Water Diversion & Bridge - Thompson Crk_1600-2018-0189-R1_HUM_MJ Barakov_Water Diversion and Bridge_NOD   PDF 341 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print