Goforth Water Diversion, Reservoir and Stream Crossing Project (Streambed Alteration Agreement No. 1600-2018-0839-R1)

797 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Goforth Water Diversion, Reservoir and Stream Crossing Project (Streambed Alteration Agreement No. 1600-2018-0839-R1)
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2020
Document Description
The project is limited to three encroachments (Table 1). One encroachment is for water diversion from a shallow well in the underflow of an unnamed tributary to Mill Creek. Water is diverted for domestic use. Work for the water diversion will include use and maintenance of the water diversion infrastructure. One encroachment is to decommission or upgrade a failing and undersized stream crossing. Work for this encroachment will include excavation, removal of the failing crossing, replacement with new properly sized crossing, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. If the crossing is to be decommissioned, then work will involve excavation, removal of the failing crossing and restoration of the stream channel. One encroachment is for an existing spring-fed onstream reservoir. The Permittee shall coordinate with CDFW to eliminate aquatic invasive species.

Contact Information

Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Other Location Info
The project to be completed is located within the Mattole River watershed, approximately 0.8 miles east of the town of Petrolia, County of Humboldt, State of California. The project is located in Section 2, T02S, R02W, Humboldt Base and Meridian; in the Petrolia U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 105-071-006; latitude 40.3204 N and longitude -124.2695 W at the point of diversion (POD-1).

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.